Overview
This document covers two critical areas when considering floating LNG installations:
1. Technical assessment
2. Operations
The technical assessment section provides guidance on the considerations for a floating LNG installation project. This includes pre-front-end engineering design and front-end engineering design (pre-FEED/FEED) data collection and design criteria, physical location and site assessment, the applicable floating LNG installations to
consider and project overview from commissioning to end of life.
The operations section reinforces best practices for the safe operation of floating LNG installations and their associated infrastructure. Recommendations are based on mitigating identified risks and hazards.
Content
1 Introduction and Scope
1.1 Introduction
1.2 Scope
2 Technical Assessment
2.1 Floating LNG Installation Considerations
2.2 Floating LNG Installation Concepts
2.3 Physical Site Assessment Criteria
2.4 Project and Statutory Considerations
2.5 Technology Considerations
2.6 Safety Study Considerations
2.7 Project Lifecycle Analysis
3 Operations
3.1 Installation Commissioning and Start Up
3.2 Operational Safety
3.3 Standard Operations
3.4 Emergency Response Planning
Details
Number of Pages: 98
Published Date: March 2021
Book Height: 302 mm
Book Width: 217 mm
Weight: 0.7 kg
Publication Date: March 2021